Polenist

6. Engagement Model, Timeline & Terms

The engagement has two components: a one-off setup covering Phases 1 to 3 over four months, and an ongoing monthly process covering Phase 4. This section sets out the phase plan, the month-by-month schedule, the deliverables, the visibility horizon, the fee structure and the items to confirm before kickoff. The scope of each phase is defined in sections 1 to 4.

6.1 Engagement model

Two components, priced separately. The setup is an implementation with an end date; the monthly process is a service that continues for as long as it is retained, because AI models are retrained and their answer sources change over time.

Setup
Phases 1, 2 and 3 — technical foundation (§1), source and authority building (§2) and the content engine (§3). One-off implementation, planned over four months.
Monthly process
Phase 4 — measurement and continuous optimisation (§4). An ongoing service with a monthly reporting cycle: the query set is tested, results are tracked, gaps are identified, the optimisation actions inside the monthly scope are carried out, and an action plan is issued each month.
  1. 6.1.1The two components are independent line items. The setup can be commissioned on its own; the monthly process is intended to follow it, and begins in month 2 while the setup is still running.
  2. 6.1.2The monthly process does not extend the setup. Setup work remains scoped to the phase plan at §6.2.
  3. 6.1.3Both components depend on the inputs and approvals listed at §5. Late inputs move the dates that depend on them and no others.

6.2 Phase plan

Four phases. Phases 1 to 3 form the setup and run to a finish; phase 4 starts in month 2 and repeats monthly. The phases overlap by design — source registrations take weeks to be picked up, so they start before the content work does.

RefPhasePeriodFocus
P-01Technical FoundationMonth 1llms.txt and llms-full.txt, AI crawler access, Schema.org types, sitemap, hreflang and canonical configuration, citable content formatting, docs indexation verification
P-02Source & Authority BuildingMonths 1–3Crunchbase profile, crypto directory listings, ICO listing platforms, sector media and PR placement plan, LinkedIn and corporate profile authority
P-03Content EngineMonths 2–4Target query matrix, concept glossary, extended FAQ structure, comparison and positioning content, whitepaper-derived articles, content calendar
P-04Measurement & Continuous OptimisationFrom month 2, monthlyQuery-set testing across the four AI platforms, mention rate, information accuracy and source attribution tracking, gap analysis, optimisation actions, monthly action plan
  • P-01 to P-03 are the setup. They are complete when their deliverables are handed over.
  • P-04 is the monthly process. It has no completion date; each cycle closes with the optimisation actions carried out that month, a report and an action plan.
  • Phase periods are counted from the kickoff meeting, not from the proposal date.

6.3 Timeline

The four-month setup window, month by month, with the output that each month produces. Phase codes are cited in the P-0n form used by the phase plan at §6.2.

Month 1
Phase 1 runs in full and Phase 2 begins. Output: the technical foundation is live and the first source registrations are submitted.
Month 2
Phases 2 and 3 continue and Phase 4 begins. Output: the first content set is published and the first visibility report is issued.
Month 3
Phase 2 completes. Output: the third-party source network is in place, with every registration submitted and its platform status recorded.
Month 4 onwards
Phase 3 completes and the monthly cycle continues. Output: measure, produce, optimise — repeated each month.
  1. 6.3.1Month 1 carries P-01 in full and the opening of P-02. The technical foundation goes live first, because directory and media records point back at a site that AI crawlers must be able to read.
  2. 6.3.2Month 2 is the busiest month: P-02 and P-03 both run, and P-04 issues its first report against a baseline of no measurable AI visibility.
  3. 6.3.3Month 3 closes P-02. From that point the third-party source network exists and is maintained rather than built.
  4. 6.3.4Month 4 closes P-03. After that the engagement is the monthly cycle at §4 only, unless further work is agreed separately.

6.4 Deliverables

Four deliverables, one per phase. Each carries a reference code, the phase that produces it, and the month it is handed over. The fourth recurs for as long as the monthly process runs.

RefDeliverablePhaseWhen
D-01Applied technical configuration and implementation reportP-01Month 1
D-02Source asset map, submitted registrations with their platform status recorded, and placement planP-02Month 3
D-03Published content set and content calendarP-03Month 4
D-04AI visibility report and action planP-04Monthly, from month 2
  • D-01 to D-03 are handed over once. D-04 is issued every month and is the standing output of the monthly process.
  • Each deliverable is accepted on handover. Aerion approvals required before publication are listed in section 5.

6.5 Visibility horizon

How long visibility takes to appear depends on how each system ingests sources, and the two mechanisms move at different speeds. The figures below are expectations derived from that difference, not commitments.

Real-time search
Platforms that retrieve live results at answer time, such as Perplexity and ChatGPT search, can reflect new sources within 2–3 months of the technical foundation and the first registrations going live.
Training data
Durable visibility inside model training data follows the retraining cycles of the model providers and is expected over 6–12 months, as sources published now are picked up in later datasets.
Basis
Both figures are expectations based on how these systems ingest and refresh sources. Neither is a guarantee: retrieval ranking, index refresh timing and retraining schedules are controlled by the platforms, not by Polenist or Aerion.
  1. 6.5.1What the engagement controls is the input side: an accurate, readable source layer (§1), a third-party record network (§2) and a consistent content base (§3).
  2. 6.5.2What is reported each month is measured, not projected. The metrics and the test method are defined at §4, and the first report establishes the baseline the later ones are read against.
  3. 6.5.3Movement is not linear. A query set can stay flat for two cycles and then change once a source is picked up, which is why the process is measured monthly rather than assessed once.

6.6 Fees

Four work packages, each priced separately. W-01 to W-03 are the one-off setup; W-04 is the recurring monthly fee.

RefWork packageScope summaryFee
W-01Technical Foundationllms.txt, crawler access, Schema.org, sitemap, hreflang and canonical, docs verification1,200 USDT
W-02Source & Authority BuildingCrunchbase, crypto directories, ICO platforms, PR plan, corporate profile authority1,200 USDT
W-03Content EngineQuery matrix, concept glossary, FAQ, positioning content, content calendar1,200 USDT
W-04Monthly processMonthly visibility management: AI visibility testing, mention tracking, accuracy checks, optimisation actions and the monthly action plan800 USDT / month
Total (setup)
W-01 to W-03, delivered over four months — 3,600 USDT, billed as 1,200 USDT per month across the first three months.
  1. 6.6.1This fee proposal is valid for 30 days from the publication date, that is until [date].
  2. 6.6.2The total proposal fee and the individual work-package fees exclude VAT.
  3. 6.6.3The setup work at W-01 to W-03 is planned as a four-month implementation covering phases P-01 to P-03 under §6.2.
  4. 6.6.4The monthly process at W-04 is the ongoing reporting and optimisation service under phase P-04, described at §4. It is invoiced at 800 USDT per month from month 4 onwards, with no fixed end date, for as long as it is engaged. The monthly work carried out in the first three months is covered by the setup fee.
  5. 6.6.5PR and media placement budgets and third-party platform fees are out of scope. They are reported separately and submitted for approval before anything is committed.

Exclusion — Not covered by the fees above

  • Paid PR and media placement budgets
  • Third-party platform fees, including directory, listing and profile charges
  • Whitepaper authoring — existing Aerion material is used as the source for derived articles
  • Any guarantee of placement, ranking or mention in an AI assistant answer

6.7 Open items

Nine items for Aerion to confirm before kickoff. Each one fixes a date, a scope boundary or an approval route. None of them block the start of P-01; the supporting materials behind them are listed at §5.

RefOpen itemEffect once confirmed
Q-01Priority target queriesFixes the query set that the content matrix is built around and that the monthly tests are run against.
Q-02Confirmation of the TR and EN language scopeThis proposal is priced for TR and EN. Confirming that set fixes the content base and the schema configuration; any further language is quoted separately as a follow-up module.
Q-03Token-calendar datesDetermines when the crypto directory and ICO platform listings are submitted, so that registrations line up with the calendar.
Q-04PR and media budget approvalReleases the placement plan into execution; placement budgets sit outside this proposal and are reported separately.
Q-05Named Aerion project ownerFixes the single point of contact for access, approvals and platform information.
Q-06Approval turnaroundConfirms the response time the schedule assumes for copy, profile and publication approvals.
Q-07Monthly process start monthConfirms that the Phase 4 cycle begins in month 2 and sets the reporting date each month.
Q-08Content volumes per typeFixes the number of glossary entries, FAQ blocks, comparison pages, positioning explainers and derived articles behind the Phase 3 fee. The content types are set; the counts are agreed with the fee schedule and recorded against the CT register.
Q-09Term and notice for the monthly processSets the minimum term, the notice period and the invoicing date for W-04, which recurs for as long as it is engaged.
  • Q-01 and Q-02 set the scope of the content engine and the size of the query set that is tested each month.
  • Q-03 and Q-04 govern the timing of the source and authority work, since listings are synchronised with the token calendar and placements depend on an approved budget.
  • Q-05 and Q-06 set the coordination terms the schedule assumes.
  • Q-07 confirms the reporting cycle of the monthly process at W-04, and Q-09 the term on which it runs.
  • Q-08 converts the content types at §3.6 from categories into counts, which is what the Phase 3 fee is quoted against.